Professional Coatings

Commercial & Industrial painters for Wilmington facilities

Schools, universities, factories, and logistics hubs trust Cerro Painting for steel and aluminum coatings, safe crews, and phased schedules that keep operations running.

Key advantages

  • OSHA-compliant safety plans and lift-certified crews.
  • Night, weekend, or phased scheduling to minimize downtime.
  • Detailed reporting with before/after photos, steel/aluminum prep logs, and coating specs.
  • Low-VOC, antimicrobial, and corrosion-resistant systems for healthcare and heavy industry.
  • One vendor for painting, minor repairs, and pressure washing.

Industries

Where Cerro Painting spends most of the year

We specialize in complex campuses that require precise coordination and documentation.

Education

Summer shutdowns for schools, universities, dorms, and arenas.

Industrial

Manufacturing plants, steel structures, tanks, and conveyors.

Healthcare

Hospitals, medical offices, and labs requiring low-VOC coatings.

Municipal

Public safety buildings, water treatment, and transportation facilities.

Process

A commercial workflow designed for facilities teams

  1. 01. Scope alignment. We review plans, walkthroughs, and FM requirements, then submit safety docs and insurance certificates.
  2. 02. Phased scheduling. Work is split into shifts (overnight, weekend, or zone-by-zone) to control downtime.
  3. 03. Site protection. HEPA filtration, masking, and signage keep tenants safe while our crews work.
  4. 04. Reporting. Daily logs include crew counts, photos, material usage, and punch-list updates.
  5. 05. Close-out. Final inspections include warranty letters, touch-up kits, and maintenance reminders.

Facility dashboard snapshot

Average shift length
8 hrs
Typical crew size
5–10 painters + supervisor
Reporting cadence
Daily log + weekly recap
Safety
OSHA-10, aerial lift certifications, job hazard analysis

Office & retail

Tenant improvements, lobby refreshes, and brand rollouts coordinated with property managers.

  • Flexible access hours
  • Dust control + low-odor paint
  • Brand color matching

Industrial & warehouses

Equipment-safe prep, epoxy floors, and safety striping for coastal industrial parks.

  • Scissor and boom lift access
  • Corrosion-resistant coatings
  • Maintenance agreements

Hospitality & multifamily

Hotels, restaurants, and apartment common areas painted turnkey with coordinated trades.

  • Unit-by-unit scheduling
  • Fire-rated and antimicrobial products
  • Guest-ready cleanup

Comparison matrix

Commercial deliverables at a glance

Requirement Cerro Painting Typical low-bid
Insurance & compliance $2M liability, workers comp, OSHA-10, confined-space + lift certs Basic liability, limited documentation
Communication Dedicated project manager, shared dashboards, daily logs Phone updates only when issues arise
Scheduling Night/weekend shifts, phased zones, coordinated signage Daytime-only availability
Reporting Photo logs, material data sheets, punch-list tracking Limited documentation

Need to benchmark another proposal? Upload it inside the comparison guide.

Regions we cover

Wilmington metro

Mayfaire, Downtown, and Airport Industrial Park facilities with on-site supervisors and daily reports.

Coastal corridors

Carolina Beach, Kure Beach, and Leland retail corridors with salt-resistant coatings and hurricane-season coordination.

Need help with executive homes or rentals as well? Share your scope and we’ll coordinate with our residential painting team.

Case study

Mayfaire office park weekend repaint

A 28,000-square-foot office building needed a brand refresh without interrupting tenant operations. We delivered the repaint between Friday evening and Sunday night.

  • Coordinated with security, elevator access, and HVAC teams.
  • Used low-VOC coatings and HEPA scrubbers for Monday occupancy.
  • Created a punch-list app for tenants to log touch-ups within 24 hours.
Crew
10 painters + 2 supervisors
Budget
$32K
Duration
2 nights + 1 day
Result
Zero tenant complaints; facilities team renewed maintenance plan.

“The Monday morning handoff was seamless. Our COO mentioned the lack of paint odor as a highlight.” – Eric L., property manager

Documentation & integrations

Reporting

  • Daily logs with crews on-site
  • Material data sheets & color records
  • Before/after galleries for stakeholders

Integrations

We share updates through Buildium, AppFolio, Slack, or custom dashboards so facilities teams stay informed.

Commercial FAQ

Answers procurement teams need

Can you work after hours?

Yes. We build phased schedules for nights, weekends, or staggered tenant zones and provide security logs for every shift.

How do you manage safety?

Every project includes job hazard analyses, lift certifications, PPE plans, and weekly toolbox talks documented for your compliance files.

Do you integrate with facilities software?

We post updates through Buildium, AppFolio, Procore, Slack, or shared drives so stakeholders have a single source of truth.

Contact

Request a commercial proposal

Share facility requirements, bid documents, or RFQs. We respond with scope outlines and scheduling plans within one business day.

Phone: (631) 478-5872

Email: cerropaintings@yahoo.com